Project Description

134 separate PV Stations (projects with feed-in-premium) < 1 MW each and with a total power of 73.73 MW, in the municipality of Oreokastro Thessaloniki with connection to the High Voltage (ADMIE/HTSO)


The cluster’s 134 PVs belong to 86 different legal and natural persons who trusted ENERGIAKI DRYMOU in this pioneering and demanding journey from licensing to construction and electrification.
The private Medium Voltage (20kV) network has been constructed and consists of 9 lines (30.8 km underground pit and 13.5 km overhead) of appropriate cables (3X1X240 XLPE underground and 3X1X95 XLPE overhead) based on study.
The private 20/150kV Substation has been built on a plot owned by ENERGIAKI DRYMOU, based on the eligibility study approved by ADMIE/HTSO. The 20/150 Transformer’s power is 110MVA
The interconnection of the Substation with the Lagada ultra-high voltage Substation has been concluded with a 5.4 km long high-voltage (150kV) underground cable.
The communication of the 134 PVs is conducted with a private optical fiber network and the development of a number of antennas to fully cover the reference area at high speeds, based on a relevant study. The central point of departure of optical fibers is the Substation, where the tailor-made SCADA is located.